REFERENCES

For many years the consultants of SCAI have succesfully provided expertise and innovative solutions for airport development projects throughout the world. In order to give you an overview of the capabilities and experiences of SCAI, we have listed a number of our most recent projects and assignments.


Amsterdam Airport Schiphol

Asset Management

Location: Schiphol, The Netherlands
Client: Amsterdam Schiphol
Period: 02/2007 - ongoing

Project description:

Strategic advisor for the Asset Management Department at Amsterdam Airport Schiphol. The Asset Management Department is responsible for development, implementation and maintenance of the strategic assets at the airport, such as the terminal complex, platforms, taxi- and runways, energy supplies and parking facilities.

Services provided:

For various projects; short short- and long term maintenance planning, lifecycle cost analyses, functional and technical programs of requirements for civil and structural engineering, fire safety engineering, and electrical and mechanical engineering.


Cambodia Airports

Landside signage Project

Location: Phnom Penh, Cambodia
Client: Cambodia Airports Authorities
Period: 08/2015 - 02 /2016
Partner: Gauff Consultants, Frankfurt am Main, Germany

Project description:

The project consist of a comprehensive signage strategy for the airport landside, including the extended and refurbished car parking area, at Phnom Penh Airport.  

Services provided:

Review existing signage system, interviews with stakeholders, concept design signage system and assistance to local partner in final design stage.


Cambodia Airports

Landside signage Project

Location: Siem Reap, Cambodia
Client: Cambodia Airports Authorities
Period: 10/2015 - 04 /2016
Partner: Gauff Consultants, Frankfurt am Main, Germany

Project description:

The project consist of a comprehensive signage strategy for the airport landside, including the extended and refurbished car parking area, at Siem Reap Airport.  

Services provided:

Review existing signage system, interviews with stakeholders, concept design signage system and assistance to local partner in final design stage.


Bintan Airport

Aerospace Park Long Term Vision

Location: Bintan Island, Indonesia
Client: Bintan Aviation Investments
Period: 08/2015 - 02/2016

Project description:

The development of the Aerospace Park at BIA targets for a great part at secondary and tier industry segments that are a) area consuming and cost-sensitive and b) are aviation affine. The intention of BIA’s Aerospace Park is to add considerable value to the region’s economy and at the same time help SIN Changi Airport to concentrate on its core business: the high-profile hub activity.

Services provided:

Preparation and illustration of a viable concept for the Aerospace Park including its commercial / urban zones


Ho Airport, Volta Region

New Domestic airport

Location: Ho, Republic of Ghana
Client: Ghana Airports Company Ltd (GACL) / Amandi Holdings Ltd
Period: 07/2015 - 11/2016
Commissioned by: Deerns Consultants, Rijswijk, The Netherlands

Project description:

New domestic airport at HO, Volta Region, Republic of Ghana. The role of Ho airport will be to provide adequate infrastructure for regional air services to strengthen the cohesion of the city of Ho and the Volta region with the greater economic centers of Ghana.

Services provided:

Preparation Airport Master Plan phase 1 and phase 2 stage, preparation of Basis of Design document, concept design passenger terminal building and concept design other airport related facilities, including a ATC tower, a R&FF building and ATC facilities.   


Amsterdam Airport Schiphol

Maintenance Strategy Airside Infrastructure

Location: Schiphol, The Netherlands
Client: Amsterdam Schiphol, Department AMS
Period: 12/2014 - 05/2015

Project description:

Development of a maintenance strategy for the airside infrastructure whereby the evaluation criteria operational excellence, environmental capacity and the technical feasibility of the activities are optimally balanced.

Services provided:

Decomposition runway systems, cost calculations work packages, development multiannual plan maintenance strategy airside infrastructure.


Helsinki Airport

Master Plan Second Opinion Study

Location: Helsinki, Finland
Client: Finavia Corporation
Period: 08/2014 - 12/2014
In cooperation with: planeground consulting, Cologne, Germany

Project description:

In order to strengthen Helsinki's competitive position as an international EU-Asia hub with an excellent product for airlines and passengers, a strategic land-use plan, master plan and a terminal concept haven been developed for the next 10 years. To ensure the optimum outcome of the master plan and its associated short term development, Finavia asked planeground consulting for a second opinion.

Services provided:

Second opinion on the following studies: Land-Use Plan and Master Plan 2035, Terminal Development Concept 2025 and Study on Interim Capacity 2020.


Mauritius Airport

ATC Tower Proposal

Location: Maritius
Client: Airports of Mauritius co Ltd
Period: 03/2014 - 06/2014
In cooperation with: Deerns Consultants, Rijswijk, The Netherlands & Paul de Ruiter Architects, Amsterdam, The Netherlands

Project description:

Sir Sewoosagur Ramgoolan (SSR) International Airport has recently opened a new passenger terminal. The master plan envisions further expansions of the airport and terminals in the future and include, among others, a new ATC facility.

Services provided:

Tower location study, functional analysis, program of requirements and functional layout control tower and civil design tower area.


Bintan Airport

New Passenger Terminal building

Location: Bintan, Indonesia
Client: Bintan Aviation Investments
Period: 08/2013 - 12/2013

Project description:

Bintan Island is located in close proximity to Singapore. The first phase of the development of Bintan Airport is the construction of a runway an a passenger terminal to accommodate initial traffic. The airport terminal will be connected to a ferry terminal which will service Singapore and Batam
Bintan Airport could be developed into a multi terminal airport with two runways.

Services provided:

Terminal area master plan and concept design passenger terminal building.


Nairobi Airport

Proposal Concept design interim passenger Terminal

Location: Nairobi, Kenya
Client: Kenya Airports Authority (KAA)
Period: 09/2013 - 10/2013
Commisioned by: Deerns consultants, Rijswijk, The Netherlands

Project description:

On August 2013, a fire took the arrival facilities of the existing terminal out of operation. To accommodate the current passenger demand and provide additional capacity, the airport urgently needs an interim  terminal facility to replace the arrival and part of the departure facilities until new permanent facilities will be made available.

Services provided:

Facility sizing and development terminal concept.


Krasnodar Airport

Master Plan

Location: Krasnodar, Russia
Client: OJSC Krasnodar International Airport
Period: 05/2013 - 07/2013
Commisioned by: Deerns consultants, Rijswijk, The Netherlands

Project description:

Planning competition procedure for the right to enter into a contract for the design of the general layout for KKR International Airport.

Services provided:

Draft preparation of long-term development concepts under premises ofimproved / new RWY-Systemand optimum environmental compatibility.


Regional Airports Indonesia

Location: Indonesia
Client: Government of Indonesia
Period: 02/2013 - 05/2013
In collaboration with: van Mourik Architects, The Hague, The Netherlands

Project description:

Because of rapid economic growth and increasing prosperity, air traffic in world's largest island archipelago has scaled up intensively. As an answer to this growth Indonesia is investing in the regional air traffic infrastructure. A key component of this program is the development of a series of local airports.
Thedesign is a prototype for new and/or existing regional airports, and include different development scenarios.

Services provided:

Master plan and airport facilities development(concept stage).

 

Aberdeen Airport

Master Plan Second Opinion Study

Location: Aberdeen, Scotland
Client: Aberdeen International Airport
Period: 07/2012 - 11/2012
In cooperation with: planeground consulting, Cologne, Germany

Project description:

Aberdeen Airport is one of the fastest growing airports in the UK, due to the oil an gas industry in the region. The industry's dependence on air transportation in conjunction with the growing demand for leisure travel is the main driver for the increased traffic demand at the airport. This implies increasing capacity demand for the airport's infrastructure and handling facilities. The terminal building in particular has reached its capacity limits and face constraints now and in the future.

Services provided:

Consultancy services and management decision support to alleviate long-term airside capacity constraints and simultaneously conduct necessary short-term terminal expansion and analysis of quick-win passenger process improvements.


Amsterdam Airport Schiphol

Terminal Principles

Location: Schiphol Amsterdam, The Netherlands
Client: Schiphol Amsterdam Airport, Department TRE
Period: 06/2011 - 02/2012

Project description:

Comprehensive study about passenger terminal principles with the aim to optimize future asset usability and flexibility of the terminal assets.

Services provided:

Analysis of the existing functionality in the terminal buildings, interviews with stakeholders, definition of concepts, defining parameters, development of terminal concepts and review of alternatives.